We’ve carried out work for individual householders and for major public authorities such as Scottish Water, Highlands and Islands Airports Ltd and Shetland Islands Council. All of them have benefitted from our care and attention to detail. Whatever the scale of the project, we take the same rigorous approach in planning and undertaking it.
On this page, we’ve highlighted several of the projects and you can read more about them by following the links provided.
We’ve also listed many other projects, which we hope will provide an indication of the range of work that we do.
Highlighted Projects
Fitful Head SSR Site, Shetland
Electrical and Builders work to refurbish Secondary Radar Installation
Runway 09/27 AGL Upgrades, Sumburgh Airport, Shetland
Installation of replacement AGL field systems, including electrical works and fitting of seating rings (with Balfour Beatty) HIAL 2006
Runway 15/33 AGL Upgrades, Sumburgh Airport, Shetland
Installation of complete AGL Field System and complete AGL Control System, including all electrical and civils works HIAL 2008
Heating Boilerhouse at Wilsness Terminal, Sumburgh Airport, Shetland
Complete Refurbishment of Heat source equipment, including new boilers, pressurisation systems, control equipment and Flue System. HIAL 2010
New House at Alderaan, Ward Hill, Shetland
Building of New House for Laurence and Anita Jamieson 2009
Read moreNew Fire Training Facility, Sumburgh Airport
Site clearance, Foundations, Drainage, Sewers, Electrical works, Sheltering Bund and Fencing. Highlands and Islands Fire and Rescue Services 2011
Yell Water Treatment Works
Electrical and Mechanical Installation works for new build water station, including Generator, Lighting, Power, Pump Control, PLC, Fire Alarms, Instrumentation and Flow Control Scottish Water Solutions
Windhager Biomass Installations
Other Projects
| CLIENT | CONTRACT | DATE |
| MPB Civil Engineering | Compass Head SIF Site – Electrical works to enable temporary Secondary Radar Installation | |
| NATS | Compass Head Primary Radar Site – Civils, Builders and Electrical works to allow installation of replacement Primary Radar System | |
| AIRBP | Fuel Depot, Sumburgh Airport – Cleaning, preparation and painting of Fuel storage tanks. | |
| Jamie and Lousie Leslie | Houster, Scholland – Building of New House | |
| CHC Helicopters | Search and Rescue Hanger – Demolition of existing internal buildings and Replacement with new structures including, Builders Work, Heating System, Standby Power Generator, Fire Alarms, Electrical Installation and Mechanical Installation. | 2007 |
| Tulloch Developments | Morrison Dock Shore Power – All electrical works. | |
| Sletts and Twagoes Sewage Pumping Stations – All Electrical works to enable provision of two new pumping stations. | ||
| SIC | Hamnavoe Primary School – Refurbishment of Boiler House, provision of new plant, all electrical and mechanical works. | |
| Siemens Water Technologies | Yell Water Treatment Works – All Electrical works to enable installation of new Membrane Filter System. | |
| Scottish Water | Fair Isle Water Treatment Works – Electrical installation works on new station. | |
| Scottish Water |
Baltasound Sewage Pumping Station – Electrical Installation works to enable new Waste water pumping station. | |
| Scottish Water |
Papastour Water Treatment Works – Electrical installation to allow new water treatment provision to remote island. | |
| Scottish Water |
Unst Water Treatment Works - Electrical installation to allow new water treatment provision to remote island. | |
| Scottish Water |
Ringasta Sewage Pumping Station - Electrical Installation works to enable new Waste water pumping station. | |
| Scottish Water |
Gulberwick Sewage Pumping Station - Electrical Installation works to enable new Waste water pumping station. | |
| AIRBP | Sumburgh, Scatsta and Stornoway – Electrical works to allow upgrades to safety systems regarding fuel pumping and levels. EEX Installations. | 2010/11 |
| NATS | Sandwick Radar Station, Lewis – Installation of new Standby Generator systems, including all mechanical and electrical works, double contained fuel lines. | |
| SIC | Port Control, Sella Ness – Installation of new Standby Generator, all electrical and mechanical works. | |
| NATS | Compass Head Radio Site – Installation of new Standby Generator, all electrical, mechanical and builders works. | |
| HIAL | Wilsness Terminal Building – Replacement of DHW copper pipework with Welded Instaflex systems. | |
| HIAL | Wilsness Fuel Storage – Provision of Roof over existing Fuel Storage tank | |
| HIAL | Wilsness Terminal – Upgrades to Domestic Arrivals Area, all builders, electrical and mechanical works. | |
| HIAL | Wilsness Terminal - Upgrades to Domestic Departures Area, all builders, electrical and mechanical works. | |
| HIAL | Fire Training Facility – Civils, Mechanical and Electrical works to allow installation of Aircraft Fire Training Simulator, includes pump control, concrete works, drainage provision, storage tanks, lighting and buildings. |